NBS Ratings are Changing: What Does This Mean for Your Commercial Lease?

24 Nov 2026
Author: Jack Sullivan

NBS ratings have become a familiar feature of New Zealand's commercial property market.

For landlords and tenants, the seismic performance of a building can influence decisions about whether to lease premises, what lease terms are acceptable, and whether seismic strengthening work is required.

However, significant changes are being made to New Zealand’s earthquake-prone building regime. From 1 July 2027, the current system will largely be replaced by a more proportionate, risk-based approach to identifying and managing earthquake-prone buildings.

One of the significant changes is that %NBS ratings will no longer determine whether a building is earthquake prone under the statutory regime.

That does not necessarily mean that NBS ratings will stop mattering in commercial leasing.

What is an NBS rating?

NBS stands for “New Building Standard”.

A %NBS rating is used to indicate the seismic performance of an existing building relative to the standard expected of a new building constructed at the same location.

Under the current earthquake-prone building regime, %NBS has an important regulatory role. Buildings assessed as being below 34% NBS can fall within the statutory definition of an earthquake-prone building.

The concept has also become widely used outside the regulatory system. Seismic ratings can be relevant to landlords, tenants, purchasers, lenders and insurers when considering the risks associated with commercial premises.

What is changing?

The Building (Earthquake-prone Buildings) Amendment Act 2026 received Royal assent on 25 September 2026.

Most of the new regime will take effect from 1 July 2027.

The changes are intended to move New Zealand towards a more targeted approach to earthquake risk. Rather than relying on %NBS ratings to identify earthquake-prone buildings, the new regime focuses more specifically on particular categories of vulnerable buildings in medium and high seismic zones.

These include certain unreinforced masonry buildings and taller buildings constructed using heavy materials.

The remediation required will also depend on factors including the type and location of the building. Depending on the circumstances, this may involve measures such as façade risk mitigation or targeted seismic strengthening.

Importantly, these changes narrow the statutory earthquake-prone building regime. They do not mean that seismic risk has disappeared.

Does %NBS still matter?

From 1 July 2027, a %NBS rating will no longer determine whether a building is earthquake prone for the purposes of the Building Act.

That is an important change.

However, there is a distinction between a building’s status under the statutory earthquake-prone building regime and the way seismic risk is treated commercially.

Landlords, tenants, purchasers, lenders and insurers may continue to be interested in the seismic performance of a building even where it does not fall within the new statutory regime.

A tenant considering taking a long-term lease, for example, may still want to understand how the building is expected to perform in an earthquake. Similarly, seismic performance may remain relevant to decisions regarding financing, insurance and future investment in commercial property.

This means that removing %NBS from the statutory assessment process does not necessarily make existing seismic information irrelevant.

What does your lease say?

For landlords and tenants, the wording of the lease remains important.

Many existing commercial leases were negotiated while %NBS played a prominent role in the earthquake-prone building regime. Some leases also contain provisions dealing specifically with seismic performance or strengthening work.

Depending on the particular lease, relevant terms may address matters such as:

·        Whether the landlord is required to carry out seismic strengthening work;

·        Whether a particular seismic standard has been agreed;

·        Access to the premises while strengthening work is undertaken;

·        Responsibility for the costs associated with work;

·        Rent and outgoings during periods of disruption;

·        Compliance with statutory requirements; and

·        Rights to cancel the lease in particular circumstances.

The fact that the statutory regime is changing does not, by itself, determine what landlords and tenants have contractually agreed between themselves.

This may become particularly important where an existing lease expressly refers to an NBS rating or requires a particular seismic standard to be achieved or maintained.



Considerations for landlords

Landlords should be careful not to assume that a building falling outside the new earthquake-prone building regime means that seismic issues are no longer relevant.

Existing leases should be reviewed before changing plans for seismic work that may have previously been contemplated or agreed.

When negotiating a new lease or renewal, landlords should also consider carefully what commitments are being made regarding the seismic performance of the building.

Where information such as an engineering assessment or NBS rating is provided to prospective tenants, it is important that the information is accurate and that neither party assumes it necessarily determines the building’s status under the new statutory regime.

Considerations for tenants

Tenants should similarly avoid treating statutory compliance as the end of the enquiry.

Before entering into a lease, particularly a substantial or long-term lease, tenants may wish to understand the seismic characteristics and available engineering information relating to the building.

Where seismic performance is particularly important to the tenant, the lease should clearly record what has actually been agreed.

Tenants entering into or renewing leases should consider:

·        What seismic information is currently available for the building;

·        Whether further engineering advice is appropriate;

·        Whether any strengthening work is proposed;

·        What the lease says about access, disruption and rent during any work; and

·        Whether the landlord has made any specific commitment regarding the seismic performance of the building.

These issues are best addressed before the lease is signed rather than after a disagreement arises.

Lease negotiations moving forward

The changing regulatory landscape may also require landlords and tenants to think differently about how seismic provisions are drafted.

Historically, %NBS offered parties a readily understood reference point when negotiating the seismic performance of commercial premises.

As the statutory system moves away from %NBS, simply importing references to an NBS percentage into a lease without considering what the parties are actually trying to achieve may become less appropriate in some cases.

Future leases may therefore require greater care in identifying:

·        What seismic information the parties are relying on;

·        Whether a particular seismic outcome is required;

·        What work, if any, the landlord is agreeing to undertake; and

·        What happens if seismic standards, engineering guidance or regulatory requirements change during the lease term.

Clear drafting at the outset can reduce uncertainty later.

Looking ahead

New Zealand's earthquake-prone building regime is entering a period of significant change.

Although the legislation has now been enacted, most of the new regime does not take effect until 1 July 2027. Further technical detail will also be important in determining how the new system operates in practice.

If you would like to discuss any aspect of a commercial lease, whether you are entering into a new lease, renewing an existing lease or considering your options as a landlord or tenant, our team at DTI Lawyers is available to assist.



 
PrintBack
 
 
NBS Ratings are Changing: What Does This Mean for Your Commercial Lease?
About the Author
Jack Sullivan
Jack Sullivan is an Associate in the Commercial, Property and Private Client team at DTI Lawyers.